{"id":4770,"date":"2026-03-30T15:13:00","date_gmt":"2026-03-30T12:13:00","guid":{"rendered":"https:\/\/avnbmu.com.ua\/?p=4770"},"modified":"2026-03-30T23:45:09","modified_gmt":"2026-03-30T20:45:09","slug":"large-scale-big-construction-launched-at-the-eu-border","status":"publish","type":"post","link":"https:\/\/www.avnbmu.com.ua\/en\/news\/large-scale-big-construction-launched-at-the-eu-border\/","title":{"rendered":"Large-Scale \u201cBig Construction\u201d Launched at the EU Border"},"content":{"rendered":"\n<p>In 2026, Ukraine plans to implement a large-scale program to modernize border infrastructure. This includes the construction of a new border crossing point on the border with Romania, as well as the reconstruction of existing checkpoints along the borders with three countries.<\/p>\n\n\n\n<p>A new checkpoint in Zakarpattia region, on the border with Romania, will be located on the <strong>\u201cBila Tserkva \u2013 Sighetu Marma\u021biei\u201d<\/strong> section. Its construction is already underway.<\/p>\n\n\n\n<p>The first phase of construction \u043f\u0440\u0435\u0434\u0443\u0441\u043c\u0430\u0442\u0440\u0438\u0432\u0430\u0454 development of road infrastructure and reinforcement of the riverbank, as well as the construction of access roads and lighting. It also includes the arrangement of 7 traffic lanes, inspection zones, and the necessary operational infrastructure.<\/p>\n\n\n\n<p>At the same time, Ukraine will reconstruct key border crossing points:<\/p>\n\n\n\n<ol>\n<li><strong>\u201cPorubne \u2013 Siret\u201d (border with Romania)<\/strong><br>The project includes additional lanes for inbound freight traffic, installation of weighing equipment for customs control, and the creation of parking areas for heavy vehicles.<\/li>\n\n\n\n<li><strong>\u201cLuzhanka \u2013 Beregsur\u00e1ny\u201d (border with Hungary)<\/strong><br>The reconstruction \u043f\u0440\u0435\u0434\u0443\u0441\u043c\u0430\u0442\u0440\u0438\u0432\u0430\u0454 expansion of infrastructure, including construction of new administrative buildings, weighing complexes, inspection areas, vehicle holding zones, and pedestrian infrastructure.<\/li>\n\n\n\n<li><strong>\u201cUzhhorod \u2013 Vy\u0161n\u00e9 Nemeck\u00e9\u201d (border with Slovakia)<\/strong><br>The project includes new lanes for passenger cars and buses, construction of customs and border control pavilions, canopies, and in-depth inspection areas.<\/li>\n<\/ol>\n\n\n\n<p>In 2026, Ukraine also plans to complete infrastructure works at the <strong>\u201cBronnytsia \u2013 Unguri\u201d<\/strong> checkpoint (border with Moldova), as well as carry out major repairs at the following checkpoints:<\/p>\n\n\n\n<ul>\n<li>&#8211; <strong>\u201cChop (Tysa) \u2013 Z\u00e1hony\u201d<\/strong> (border with Hungary)<\/li>\n\n\n\n<li>&#8211; <strong>\u201cMalyi Bereznyi \u2013 Ub\u013ea\u201d<\/strong> (border with Slovakia)<\/li>\n\n\n\n<li>&#8211; <strong>\u201cSolotvyno \u2013 Sighetu Marma\u021biei\u201d<\/strong> (border with Romania)<\/li>\n<\/ul>\n\n\n\n<p>According to OBOZ.UA, March 30, 2026.<\/p>\n\n\n\n<p><em>Photo source: freepik.com<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In 2026, Ukraine plans to implement a large-scale program to modernize border infrastructure. This includes the construction of a new border crossing point on the border with Romania, as well as the reconstruction of existing checkpoints along the borders with three countries. A new checkpoint in Zakarpattia region, on the border with Romania, will be [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":4763,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10],"tags":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.avnbmu.com.ua\/en\/wp-json\/wp\/v2\/posts\/4770"}],"collection":[{"href":"https:\/\/www.avnbmu.com.ua\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.avnbmu.com.ua\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.avnbmu.com.ua\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.avnbmu.com.ua\/en\/wp-json\/wp\/v2\/comments?post=4770"}],"version-history":[{"count":3,"href":"https:\/\/www.avnbmu.com.ua\/en\/wp-json\/wp\/v2\/posts\/4770\/revisions"}],"predecessor-version":[{"id":4774,"href":"https:\/\/www.avnbmu.com.ua\/en\/wp-json\/wp\/v2\/posts\/4770\/revisions\/4774"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.avnbmu.com.ua\/en\/wp-json\/wp\/v2\/media\/4763"}],"wp:attachment":[{"href":"https:\/\/www.avnbmu.com.ua\/en\/wp-json\/wp\/v2\/media?parent=4770"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.avnbmu.com.ua\/en\/wp-json\/wp\/v2\/categories?post=4770"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.avnbmu.com.ua\/en\/wp-json\/wp\/v2\/tags?post=4770"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}